How to Pay for a Kitchen Renovation in Québec: Your Options
There are three ways to pay for a kitchen renovation in Québec: from savings, with credit arranged through your own bank or caisse, or with financing arranged through the contractor. Which one suits you is for you and your financial institution to decide. Our part, as the studio that writes the quote, is to tell you what the number is made of, when the first payment falls due and what to settle before you sign.
This guide is for a whole-room project, the kind our complete kitchen renovation service covers. It contains the planning ranges we publish, the way our deposit works, and a Pointe-Claire kitchen whose drawings waited a year for the money.
Three ways homeowners pay for a kitchen
The three routes differ mostly in who you deal with and how early everything has to be in place.
| Way to pay, and with whom | When to arrange it | What to ask for in writing |
|---|---|---|
| Savings: your own accounts | Before the deposit date | The quote and its payment schedule, from the contractor |
| Credit from your bank or caisse: your advisor or mortgage broker | Early, before the drawings are final | Amount approved, how long it stands, how funds are released, every fee |
| Financing arranged through the contractor: the lender | Before you sign | The cost of the credit and every condition, from the lender |
With savings, no lender asks what the figure leaves out, so that question is yours to ask. Which kind of credit is open to you is a question for your own institution.
The third route is financing arranged through the contractor. On our side it comes down to this. Financing offered by iFinance. iFinance is the lender and decides on each application; Limakdéco is not a lender.
A budget built from published ranges
The size of the budget does not have to be a guess. We publish our planning ranges for 2026, and a first budget takes four moves.
- Start with cabinetry and countertops alone: approximately $15,000 to $60,000 and up, depending on size, materials and the type of work.
- Add demolition, flooring, plumbing and electrical, assessed on site and itemised in writing in the same quote.
- Set aside the appliances themselves and any permits, which stay separate from our quote.
- Leave room for your own additions, the only thing that moves our price once the plan is final.
Inside the first line, custom kitchen cabinets carry a planning range of $550 to $850 per linear foot, and countertops are priced per square foot installed, by material. Each line is explained in our guide to what a custom kitchen costs in Montréal.
What the quote covers and what it leaves out
You can only fund a number once you know what it buys. On a complete renovation, our quote gives a written price for the cabinetry and the countertop and prices the other lines (demolition, flooring, the trades) in writing in the same document. The showroom consultation, the handles and all design work are always in it, AutoCAD drawings and 3D plans included (a $500 to $1,500 value).
So if you hold our number against a cabinet-only price from somewhere else, look for plumbing, electrical, flooring, demolition and disposal before comparing totals; our quote comparison checklist goes through them one line at a time. Whichever way you pay, plan for the total for the room plus what sits outside the quote.
How our price and the 50 percent deposit work
Our five-stage process starts with a showroom visit and a measure at your home, both free. Design then takes five working days at most, and a realistic budget is discussed before any design work begins.
Then comes the price, and it holds. Our first price after the final plan is the final price: it only changes if you add something yourself along the way, and anything you add after signing is confirmed in writing first. Once the drawings are signed, the number you approved is the number you pay.
A 50 percent deposit starts production, so that is the day your funds have to be within reach. Cabinet fabrication then typically takes three to four weeks and cabinet installation one to three days; the schedule for the complete renovation depends on the agreed scope and is confirmed before work begins. The deposit is the one payment point we publish. The rest belongs in writing on your quote, so if a date or an amount is missing, ask before you sign.
The Pointe-Claire kitchen that waited a year
Money and drawings do not have to move at the same speed. Our green and gold kitchen in Pointe-Claire is the proof we point to. The owners first walked into the showroom a summer before we built it, with one request, more storage, and a refinancing that was not ready.
So the drawings waited, without pressure. A kitchen that has not been ordered has cost its owners nothing: the visit, the measure and the quote are free.
When they came back the following summer, the answer to “more storage” turned out to be structural. The wall came down. The island grew, with one end anchored where that wall had stood, and the cabinets ran to the ceiling. We built it in glossy white thermofoil and matte sage green on 16 mm melamine boxes, under Vicostone Beryl quartz, with a gold sink, a gold faucet and gold pulls. It was handed over in July 2026. The refrigerator wall was drawn in AutoCAD in our office before anything was cut.
What we keep from that project is the order of things. A decision the size of a wall is far easier to take on paper, with the funding settled, than in the middle of a job. The structure is verified first and the new layout drawn, which is the subject of our post on removing a kitchen wall.
If the money is the slow part, come anyway. Pointe-Claire is one of the areas where we renovate most often, and those owners were not pressed to order before their money was ready. On your return, check the expiry date on the written quote and have the price confirmed if it has passed.
What to settle with your bank before signing
Choosing the product is your advisor’s work. Seen from the workshop, four answers decide whether the money and the kitchen arrive together.
The first is how much is approved and for how long. A kitchen is not ordered the day a lender says yes: the measure, the design and your choices of door, colour and stone come first. The second is when the funds can be drawn, because production starts on the 50 percent deposit and money that lands later pushes the order back.
The third is what the credit costs to set up, to carry and to repay early, in writing. The fourth gets forgotten: what happens if the project grows. In Pointe-Claire, storage became a wall. Ask ahead of time how a change of that size would be handled.
On the contract itself, the Office de la protection du consommateur recommends a written contract and checking the contractor’s licence. Payment terms belong in that contract: have them written down with the work, the materials, the price and the dates. Ours is RBQ licence 5825-8039-01.
What to bring to the first visit
Bring photos of the room as it is today, rough dimensions or a floor plan, the appliances you are keeping and replacing, and a budget range, so the design starts inside numbers that work for you. If the money is not arranged yet, say so. We can then draw a kitchen you will not have to cut down later.
Does my financing have to be approved before I visit the showroom? No. The visit and the measure are free, and the Pointe-Claire drawings waited a year. What has to be ready is the deposit, on the day production starts.
Can the price rise after I have arranged the money? Only if you add something. Our first price after the final plan is the final price.