A year to start, two weeks to finish
The owners first came to the showroom a summer ago. Their refinancing was not ready, so the drawings waited, without pressure, until this year. When they came back, the answer to their one request, more storage, turned out to be structural: the wall came down, the island grew with one end anchored where that wall had stood, and the cabinets ran to the ceiling. Two colours carry the room, glossy white thermofoil and matte sage green, on 16 mm melamine boxes. Gold finishes the sentence: the sink, the faucet, every pull. Drawn in our own office, built in our own Saint-Laurent workshop, installed two weeks after the green light.



